GRLS 96 Ratio 4C IP41

Introduction

Rotary limit switches are directly attached to the gearbox of the motor with a shaft and a coupling. The coupling helps in relieving stress to the shaft of the limit switch in case of Misalignment . The movement of the gearbox rotates the shaft of the limit switch .

Call 9137620579 for Enquiry
Rotary Limit Switch Working Principle

Working of GRLS 96 Ratio

Rotary Geared Limit Switch GRLS is used to trip motor supply when the moving loads reach the extreme end positions of working zone. The driving motion is transmitted by worm gear through worm shaft. The rotations and movements are transmitted to switches by adjustable cams.

Lever Limit Switch Working Principle

Applications of Rotary Limit Switch

Rotary Limit Switches are used whenever you need to count the angle or number of rotations and stop a rotating piece of equipment when it reaches it rotating limit.

  • EOT Cranes

  • Electric Hoists

  • Gantry Cranes

  • Goliath Cranes

  • Mobile Cranes

  • Tower Cranes

Anand FG Rotary Geared Limit Switch Technical Data Specifications

Body Black Nylon
Material Cover Shock Resistance Thermoplastic
Protection Degree IP-55 Confirming to IS-13947(Part-1)1993 :Dust ingress and protect against low pressure water jet from any direction.
Gear Ratio 1:12.5, 1:25, 1:50,1:100 & 1:400
Drive Worm Screw
Cable Entries 2, 3/4 Conduit
Rated Voltage Insulation 500 VAC.
Thermal Test Current 10Amps
Maximum Speed 1200 rpm
Wire Connection Screw Terminal

Warranty:

GRLS 96 Ratio 4C IP41 “1 years warranty” on internal electronics circuits from the date of Dispatch
Contact us:
Get in touch with us at 91376-20579, info@anandcontrol.in or visit our website www.anandcontrol.in
Get Instant Quotation

Packing Details:

GRLS 96 Ratio 4C IP41 comes in a durable and eco-friendly Packing designed to ensure safe delivery.

1 GRLS 96 Ratio 4C IP41

ARC_6_BUTTON_CHECKING_WITH_PACKING_BOX
ARC_6_BUTTON_PACKING_BOX

Monitored Delivery

The logistics tracking management system does not guarantee faster delivery but ensures monitored delivery, thus facilitating the overall process by getting an insight regarding the causes of delay or any foul play, causing delayed or failed deliveries.

ARC_6_BUTTON_DELIVERY_IMG